The British Standards Institution (BSI) is the UK National Standards Body (NSB). It publishes standards and provides a range of books, self-assessment tools, conferences and training services. It also represents UK economic and social interests in European and international standards organisations.
BS 7974 Application of fire safety engineering principles to the design of buildings. Code of practice is aimed at fire safety engineers (FSE) and practitioners, and is also intended for:
- Members of the fire and rescue service.
- Structural engineers.
- Architects.
- Government agencies.
- Regulators
- Related industries such as insurers and systems engineers.
BS 7974 was originally released in 2001, with additional updates in 2002, 2003 and 2012. In 2016, however, a 2019 update was the first complete revision since the initial publication of the standard.
[edit] Published documents
Due to the number of published documents (PDs) associated with BS 7974, the complete standard is available as a suite of documents, which includes:
- PD 7974-1 Initiation and development of fire within the enclosure of origin.
- PD 7974-2 Spread of smoke and toxic gases within and beyond the enclosure of origin.
- PD 7974-3 Structural response and fire spread beyond the enclosure of origin.
- PD 7974-4 Detection of fire and activation of fire protection systems. NOTE: This document is no longer maintained since it has been incorporated into other documents, but it is referred to as part of the PD 7974 series for the sake of completeness.
- PD 7974-5 Fire and rescue service intervention.
- PD 7974-6 Occupant evacuation, behaviour and condition.
- PD 7974-7 Probabilistic risk assessment.
The practices included within the standard are applicable to all types of new construction and existing buildings. It is based on an approach to fire safety that focusses on the protection of people and property while showing sensitivity to the environment.
[edit] Qualitative design review
This analytical process is based on the concept of qualitative design review (QDR), which is a technique that allows fire safety engineers to consider the possible ways a fire hazard might arise and establish a range of strategies to maintain the risk at an acceptable level.
The process is broken down into three stages:
- Initial review. Objectives are defined, criteria are established and solutions are proposed.
- Analysis: Evaluations are made of solutions identified in the initial review.
- Assessment: The results of the analysis are measured against the criteria in the initial review.
[edit] Related articles on Designing Buildings Wiki
- Addressing building failures: Grenfell Tower and Edinburgh schools.
- British Standards Institution BSI.
- BS 9999: Code of practice for fire safety in the design, management and use of buildings.
- BS EN 13501-1
- Fire engineered building.
- Fire in buildings.
- Overview of automatic sprinkler system design and operation
- Qualitative design review.
- The role of codes, standards and approvals in delivering fire safety.
[edit] External resources
- BSI, BS 7974:2019.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Building Safety Act implementation in Wales
CIAT to host industry panel on 26 June.
New and updated CLC building safety guidance.
New UK National Buildings Database.
Building Safety Wiki Interviews
Chief executive of the British Woodworking Federation.
Planning condition discharge in England and Wales
A brief explanation from a building compliance expert, with further links.
Overheating guidance and tools for building designers
Guidance for dealing with element of building fabric control that have increasing importance.
Shading for housing, a design guide
From the Good Homes Alliance and British Blind and Shutter Association.
UK Standard Skills Classification (SSC)
A shared framework for describing skills needs.
Social media ban consultation comes to close
CIOB urges UK Government to consider social media’s role in careers guidance in ban debate.
The latest of eight Skills England apprenticeship units
The addition of battery manufacturing welcomed by ECA with a warning about the risks of fast-tracked apprenticeship units.
Building Control Independent Panel final report
A precis of a key report led by Dame Hackitt with full recommendations and link to the government response.